Lift Station No. 1

TKDA assisted the City of Brooklyn Center with the rehabilitation of a 20-year-old, 5,000 gpm lift station. Our services included preparing the design basis report, developing plans and specifications for bidding, and performing construction observation and management.

Project features include:

  • Removing and replacing three 1,700 gpm pumps
  • Adding an influent submersible grinder to reduce debris accumulation in the wet well
  • Installing a flushing system and hydraulic improvements to the wet well to reduce accumulation of solids in the wet well
  • Replacing the motor control center, SCADA interface, and automatic transfer switch for backup power

 

CLIENT: City of Brooklyn Center
LOCATION: Brooklyn Center, Minnesota